How do data centres work, and why is power the limit for AI data centres?

Power, cooling and the energy wall

Data centres: A data centre turns electricity into computing and then, almost all of it, into heat that cooling must carry away; so every new hall needs a grid connection for its servers and its cooling, and power, not land or chips, has become the limit on where and how fast they grow.

Loading the animation…

Say it like this A data centre turns electricity into computing and then into heat, so every new hall needs both power and a way to carry the heat away; that makes grid power, not land or chips, the limit on where and how fast data centres can grow.

Under the hood — for builders
Real case: Ireland
Data centres went from a twentieth of Ireland's metered electricity to more than all its city homes:
Efficiency, measured
PUE: total facility power ÷ IT power. Google's fleet averaged 1.09 in 2025: 9 units of overhead per 100 of computing:
Power becomes heat
Almost all the electricity servers draw leaves as heat that cooling must remove; dense AI racks push cooling to liquid.
Grid connection
The capacity the utility agrees to deliver to a site: often the real limit on new data centres.
Watch out
PUE ignores where power comes from and how much water cooling uses. Small grids feel the strain first.
Sources
CSO Ireland, "Data Centres Metered Electricity Consumption 2023" · Google, "Efficiency" (read November 2026).

What happens in the data centres animation, step by step?

  1. "The cloud" is a building. Power comes in from the grid, the servers compute, and every watt they use ends up as heat. Here the cable in and the heat out are drawn the same width, because they are.
  2. Carrying that heat away takes more power: chillers, fans, pumps. PUE (power usage effectiveness) is total power divided by the computing's share. Google reports 1.09 across its fleet for 2025: 9% on top.
  3. Your turn: drag through Ireland's years and watch data centres' share of the country's metered electricity (CSO). Where do they pass all of Ireland's city homes?
  4. So power, not land or chips, decides where data centres can go. Each hall needs a grid connection big enough for its servers and its cooling, and where the grid is full, new halls wait in line.
  5. Power decides where a data centre can be built. The law decides where your data may be stored, and on whose cloud. Next: multi-cloud, hybrid and sovereign cloud.

What everyday example explains data centres?

A giant kettle farm. Every unit of electricity going into a kettle comes out as heat, so the farm needs a fat power line in and a way to dump the heat out; the better the plumbing, the less extra power the pumps take (PUE); and once the street's power line is full, the next farm waits for a bigger one.

Why should a team care about data centres?

When you choose a region or a colocation site, or plan AI capacity, ask about power first: what the site's PUE is, whether its grid connection has room for your growth, and where its power comes from; and expect the price and availability of compute to follow the grid.